It may differ from 20 m to a hundred m. Closer intervals are required if ground amount differs abruptly. The cross- sectional line needn't be constantly be at correct angles to the main line. This process is Preferably suited to street and railway projects. Radial Line SystemA contour survey (also referred to as a depth and stage survey) is the sta